CABLE SURVEY REPORT
SS-2026-SAMPLE
Seneca Security Inc.
SAMPLECLIENT DATA REDACTED
Cable Tracing & Documentation / New York City

Cable tracing and as-built cable documentation

Every cable in your building: traced, pinned, tested, and handed over in writing.

You inherited a building with no documentation. You are planning a buildout and nobody knows what is behind the walls. You are settling a dispute about what was installed. We walk the property with an iPad, tone every run back to its head end, pin each termination on your floor plan, and deliver a package like this one.

Sample Loft Office
123 West Sample Street, New York, NY / Client details redacted
Survey method
iPad field survey / every run tone-traced to its head end
Deliverable
PDF report / Excel workbook / CSV schedule
Turnaround
Within one week of the final site visit
Pricing
Fixed-price quote after a short scoping call
Credentials
Licensed & insured / NYC & tri-state
This sample
57 cables / 6 cable types / 3,524 ft traced
Start my report

Or download the full sample report: PDF and Excel, no email required.

Prepared by
Seneca Security Inc.
244 Fifth Avenue, Suite 2605, New York, NY 10001
Seneca Security Inc. / Low Voltage / High StandardsPage 1 of 8
Sheet 02 / 08 . Executive summaryThe one page your owner, GC, insurer or attorney will actually read.

Sample Loft Office: Executive Summary

123 West Sample Street, New York, NY
Survey October 8, 2026
57 cables / 1 floor

A field survey of low-voltage cabling was conducted at Sample Loft Office on October 8, 2026. 57 cables in 6 categories were located on the floor plan, traced to their head end, measured and tested. 11 runs failed and 2 could not be tested. Every one is listed with the reason.

57
Cables documented
1 floor / 6 cable types
3,524
Linear feet
avg 63 ft / 56 of 57 measured
77%
Pass rate
44 pass / 11 fail / 2 untested
11
Deficiencies
Each with a written cause

Cable inventory by type

Test results by type

Pass (44) Fail (11) Untested (2) Number shows failures
Finding 1
Half the coax is dead
3 of 6 TV feeds failed. Plan the AV refresh around new pulls, not re-use.
Finding 2
The boardroom needs work first
Floor box shorted (DATA-02) and a dead ceiling speaker (SPKR-02) in the room clients see.
Finding 3
Cheap wins before new cable
2 live runs never terminated. 1 booth locked during survey. Neither needs a new pull.
Sample Loft Office / SS-2026-SAMPLEExecutive Summary / 2 of 8
Sheet 03 / 08 . Floor-plan overlayLive. Hover or tap any pin. Every termination ties to exactly one row.

Sample Loft Office: Seventh Floor

57 of 57 cables shown / 11 failed / 2 untested

Red ring = failed test / Gray ring = untested / Numbers run per cable type

Seventh floor plan of a 25 by 100 foot loft office: conference room and office at the rear, open workspace, cafe, core with stair, restrooms, elevator and IT room, reception, second workspace, executive office and office at the street front

Cable Schedule: Seventh Floor

PinCable IDTypeRoomHead-endLenTestNotes
Sample Loft Office / SS-2026-SAMPLESeventh Floor / 3 of 8
Sheet 04 / 08 . Download & contentsTake it with you. The same files a client receives.

Download the sample report

The full package behind this page / client details redacted / no email required
2 files
PDF + Excel

Sample Report: PDF

9 pages / 11 x 17 / 1.2 MB

Cover, executive summary, head-end view, the floor-plan overlay with all 57 pins, and the full cable schedule. Exactly what goes in the as-built binder.

Download sample PDF

Sample Workbook: Excel

5 sheets / Letter / 24 KB

Cover, summary, master schedule, per-floor schedule and head-end view. Sort it, filter it, or import it into your facilities system.

Download sample Excel

What is in every package

  1. 01

    Floor-plan overlays with pinned terminations

    Your actual plans, every termination pinned where it is, color-coded by type and numbered to the schedule. Floor by floor on multi-level buildings.

    PDF
  2. 02

    Cable schedule

    Cable ID, floor, type, room, head-end port, length, test result and the reason behind every failure, plus a master schedule across all floors.

    PDFXLSXCSV
  3. 03

    Head-end logical view

    Every cable grouped by where it lands: patch panel, NVR, phone block. Your IT lead sees the plant the way it is patched.

    PDFXLSX
  4. 04

    Executive summary

    The state of the plant on one page: inventory, footage, pass rate and every deficiency. Repairs are quoted separately. The survey is yours.

    PDF
  5. 05

    Fluke test results

    Every data run certified to Cat5e, Cat6 or Cat6A, with the Fluke DSX report attached to its row. Common for TI handoffs and lease compliance.

    ADD-ON
  6. 06

    Head-end photography & as-built binder

    Patch panels and racks photographed and labeled to the schedule, bound with plans and summary. Physical or PDF.

    ADD-ON
Sample Loft Office / SS-2026-SAMPLEDownloads / 4 of 8
Sheet 05 / 08 . Scope of engagementNot bundled into every job. Requested when the situation calls for it.

When customers request this

Six scenarios cover the great majority of mapping jobs
Section 1.0
CASE-01

You bought the building

No documentation from the seller, installer unknown. Know what exists, where it goes and what condition it is in before you sign or take over.

CASE-02

Tenant improvement planning

Your architect or GC needs to know what is in the walls before cutting. We document the existing plant so the buildout avoids damage and plans re-use.

CASE-03

Insurance or compliance

Your insurer, lease or an audit requires documented cable plant condition. PDF reports suitable for submission, with test results tied to each run.

CASE-04

Resolving a recurring issue

Intermittent drops, repeated repairs, a mystery plant. Mapping shows the real topology and usually the root cause, instead of chasing symptoms.

CASE-05

Legal, HPD or dispute matters

Disputes over installed work or lease disagreements. A written as-built with timestamps that stands up in court or arbitration.

CASE-06

Office move or lease exit

Document what stays behind when you leave, or baseline a new space before you move in.

Sample Loft Office / SS-2026-SAMPLEScope / 5 of 8
Sheet 06 / 08 . Survey methodologyThree visits for most jobs. One for small sites.

How the engagement runs

Fixed price, no surprises mid-engagement
Section 2.0
StepActivityWhat happensOutput
01Scoping call & quoteBuilding size, floor count, approximate cable count, and whether you need Fluke testing or a binder.Fixed-price quote
02On-site surveyA technician with an iPad running our own mapping tool walks floor by floor, drops a pin at each termination and tones every cable back to the head end. Typically 20 to 40 cables an hour, depending on access.Pinned plans + raw schedule
03Office compilationSurvey data compiles into the PDF report, Excel workbook and CSV: plans, schedules, head-end view and written summary.Within 1 week
04Review walk-throughOptional handoff call or on-site walk. Handing it to an IT director, GC or lease counterparty? We brief them directly.Signed-off as-built
Sample Loft Office / SS-2026-SAMPLEMethodology / 6 of 8
Sheet 07 / 08 . Appendix AStraight answers.

Appendix A: Frequent questions

Cable tracing & documentation
7 items
A.1Is this included when you install new cable?
No. It is a separate service. New installs always ship with Fluke test reports and labeled patch panels. The full floor-plan mapping deliverable is something you request when you need an as-built of an existing or unknown plant.
A.2What does it cost?
It depends on building size and cable count. A single-floor office with 20 to 50 cables is typically a half-day survey plus compilation. Multi-floor buildings scale from there. Fluke testing and binders are add-ons. We quote a fixed price after a brief scoping call.
A.3How long does it take?
Small to mid-sized sites: one day on site, with the report inside a week. Large multi-floor buildings: 2 to 3 weeks total. We can rush when a closing or lease date is driving the deadline.
A.4Can I see a sample first?
You are reading one. Download the PDF and Excel. These are the same files a client receives, with client details redacted.
A.5Do you need our floor plans?
We work from what you have: PDFs, DWG files, even photographed paper plans. With no plans we can sketch floors during the survey, but that adds time and cost. Existing plans save real money.
A.6Will it hold up for insurance or legal matters?
Yes. The PDF is built for insurance claims, lease disputes and legal matters, with dated survey records and test results tied to every run. For affidavits or expert testimony we coordinate with your counsel.
A.7Do you fix what you find?
The survey is diagnostic. Every deficiency is listed with its cause. Repairs are quoted separately, so you know exactly what the mapping covered. The deliverable is yours to hand to any contractor.
Sample Loft Office / SS-2026-SAMPLEAppendix A / 7 of 8
Sheet 08 / 08 . AuthorizationYour building, on our cover. Fill it in.

Request your as-built

Fixed-price quote after a short scoping call
212-347-5400
Emergency 917-512-1250
Add-ons
Authorized by
Call 212-347-5400
Your cover page

Not ready? Download the sample and share it with your team.