Need cable certification testing? We test every run and deliver the PDF.
A buildout spec requires test reports. Your lease demands documented Cat6A performance. An insurance claim needs proof the cable met standards. Or you are about to upgrade and need to know which runs will carry it. We test to spec and deliver signed PDF reports.
The lease or tenant improvement spec requires test reports for every data run. Standard in Class A buildings and government work. We test to the level required: Cat5e, Cat6 or Cat6A.
Lease or buildout requirement
The lease or tenant improvement spec requires test reports for every data run. Standard in Class A buildings and government work. We test to the level required: Cat5e, Cat6 or Cat6A.
Before you accept new work
A new install just finished and you want independent certification testing before you accept it and pay the installer. We test, flag anything out of spec, and hand you a clean report or a punch list.
Insurance claim
You need to show the cable plant was in spec before a water event, fire or construction incident. We retest the runs and document what is still good and what the damage cost you.
Before a 10G or Wi-Fi upgrade
You are adding 10G switches, new Wi-Fi access points or PoE cameras, and need to know which existing runs will carry them. We test to the spec the upgrade needs and tell you which runs pass.
Unexplained network problems
The network has intermittent problems and you suspect cabling. We test the suspect runs, find failures or marginal runs, and give you a prioritized fix list.
Fiber certification testing
Backbone fiber, data center cross-connects or campus links. An OTDR trace with distance, loss and splice loss documented, delivered as a PDF.
The six tests behind a passing run.
Not just whether it works, but whether it meets the standard. This is what certification testing checks.
Wire map and pin assignment
All 8 wires terminated to the right pins at both ends. It catches miswires, split pairs and reversed pairs that are invisible without the tester.
Length and delay
The run is within the maximum length for its spec, 90 meters for a Cat6 or Cat6A permanent link. Flags runs that are too long or have too much delay skew.
Insertion loss
How much signal reaches the far end. It catches marginal cables that pass a basic continuity test but fail under load.
Crosstalk
How much the pairs interfere with each other, including the full ACR-F and PS-ACR-F suite TIA-568 requires for the spec level.
Return loss
Impedance mismatches at terminations or splices bounce signal back toward the source. This catches them before they cause dropouts in production.
Fiber loss, OTDR and length
Light loss at both wavelengths, an OTDR trace documenting length and splice loss, and verification against TIA-568.3. All on the PDF.
Need reports before move-in or sign-off?
A typical office floor of 50 to 100 drops is one day on site, and the PDF reports follow within 2 to 3 business days. We can usually schedule within a week.
You do not need the original installer.
You do not need us to install the cable to have us test it. We regularly retest installs by other integrators and deliver the test reports.
The cable types we test
Copper and fiber to the spec level you need, plus coax (RG6, RG11) and specialty low-voltage where you need documented performance.
The deliverable
Every engagement produces real documentation, suitable for a buildout, a lease, an insurance claim or your own records. Need the whole cable plant mapped, with floor plans and a cable schedule? See as-built cable documentation and a sample report.
We flag what fails. You decide what to do.
What the report shows
Every run with pass or fail at the standard you asked for. Each failure comes with a diagnosis: a wiring issue, a length problem, interference or hardware. A clear picture of what works and what does not.
If runs fail
We quote the fix after the test, whether that is a re-termination, a re-pull or a patch panel swap, or you hire the original installer to fix their own work. Either way, you know what is true about your cable plant.
Explore cabling installation →How a certification testing job goes.
Four steps, from scope to signed PDF.
Scope and quote
How many runs, which spec level, the timeline and any required standard or report format. We quote on run count and site complexity.
On-site testing
Fluke DSX for copper and OTDR for fiber. Every run tested end to end, pass or fail, with full data captured. Typically 50 to 100 runs a day, depending on the site.
Analysis and documentation
We compile the results into a clean PDF, per run or summary plus detail, build a run-by-run spreadsheet, and flag each failure with a diagnosis.
Delivery and fix quote
PDF reports by email. If runs failed, we quote the fix separately, and you can hire us or the original installer.
Cable certification FAQ.
Need certification testing? Pick the fastest way to reach us.
Talk to a technician and get an honest arrival window.
SEND A PHOTOText 646-838-2300A photo of the patch panel or the spec page speeds up the quote.
NOT URGENTRequest a quoteDescribe the system and we will come back with a clear plan.