Office move? We handle the cabling and the low-voltage side.
Cabling to pull, cameras to remount, access control to set up again, network to re-stage and AV to rebuild. We plan it with your GC and IT, and can cut over on a weekend so you open Monday as usual.
The best time to call. Cable paths and camera and door locations go into the construction plans, which avoids costly work later.
New space still being designed
The best time to call. Cable paths and camera and door locations go into the construction plans, which avoids costly work later.
Walls are open now
We pull cable during the walls-open stage, coordinated with the GC and electrician.
Walls already closed
Still workable, it just takes more effort to fish cable. We plan the routes that disturb the least.
Weekend cutover
De-install Friday evening, install over the weekend, tested before Monday open.
Reusing the old equipment
Cameras, access hardware, switches, Wi-Fi and AV usually move well. We tell you what is worth moving and what to replace.
New entrance or new building
If the new space has a different entry, we design and install the intercom and door hardware it needs.
The low-voltage side of any move.
Every move touches every system. The sequence matters.
De-install at the old space
Cameras, access hardware, intercom panels, Wi-Fi and AV removed and protected for transport.
Cabling at the new space
New runs where needed: data, cameras, doors, speakers and displays. Fluke tested before equipment goes in.
Install at the new space
Equipment mounted, terminated and set up again, with settings restored from a pre-move backup where possible and existing cards kept.
Testing and sign-off
Cameras recording, doors working with existing cards, intercom working, Wi-Fi coverage checked and AV rooms tested.
Documentation of the new space
A new system map: cable paths, patch panel assignments, jack labels and room assignments.
The best time to call is before the walls close.
Cable paths and camera and door locations are easiest to build in while the new space is designed and the walls are open. After the walls close, the same work costs more.
We work alongside your GC and IT.
Most moves involve systems we did not install. We document them before they come off the wall.
Every system we move
Each hub below covers that system in detail.
How we coordinate
Clear scope boundaries in writing and a shared schedule. If your GC wants to be the single point of contact, we run through them. If your IT provider owns certain items, we hand those over cleanly. We coordinate with your ISP too.
Move it or replace it.
Worth moving
Most cameras, access hardware, switches, Wi-Fi and AV move well with the settings brought across.
Better replaced
Gear at end of life, or that does not fit the new layout. The move is often the cheapest moment to replace it.
Explore installation services →How a move goes.
Four stages, aligned with the build-out.
Pre-move planning
We walk both spaces, inventory what is coming, design the new layout and set dates with your GC, IT and operations.
Cabling during build-out
Cable pulled while the walls are open, coordinated with the GC and electrician.
De-install and move
A short window at the old space to remove and protect equipment, timed with the move.
Install, test and sign off
Everything installed, set up and tested at the new space, documentation delivered and your team shown anything new.
Office move FAQ.
Move coming up? Pick the fastest way to reach us.
Talk to a technician and get an honest arrival window.
SEND A PHOTOText 646-838-2300Floor plans or photos of both spaces help us plan it.
NOT URGENTRequest a quoteDescribe the system and we will come back with a clear plan.